← Back to jobs

Lancesoft Logo
Construction Scheduler

Lancesoft

 

New York, NY, USA

Posted On: 30+ days ago
Experience: 3+ years
Availability: Onsite
Openings: 2
Category: Scheduler
Tenure: No Preference/Any
Related Jobs

No related jobs found

Description

You will manage detailed scheduling and analysis for a portfolio of major electrical substation and transmission projects.

This role is on-site.

Responsibilities

  • Facilitate the preparation, creation, and review of baseline and execution schedules.
  • Develop and maintain critical path logic networks and bar charts.
  • Perform critical path and float analysis reporting.
  • Report schedule status to project management and clients.
  • Provide historical data analysis for future planning and forecasting.

Required Skills

  • 3+ years of experience in construction scheduling.
  • Extensive experience with Primavera P6.
  • Required experience with Transmission Line (Feeder) projects.
  • Ability to review conceptual plans, scope documents, and designs for electrical transmission and developer interconnection projects.
  • Basic engineering knowledge in electrical, mechanical, or civil fields.
  • Proficiency in Microsoft Office, specifically MS Excel.
  • Strong analytical, communication, and organizational skills.
  • Ability to work as an individual contributor.

Preferred Skills

  • Four-year degree in Engineering, Construction Management, or a related field.
  • In-depth knowledge of utility industry project scopes.

Education

Any Graduate

Related Jobs

No related jobs found

← Back to jobs